Current Projects

List of Ongoing Projects

S. No.Contract No.Project TitleProject Description / SpecificationMonth AwardedExpected Completion DateOwnerClient
118175/SC-0043Design, Supply, Welding, Site Erection, Testing, Calibration, and Painting of Settling Tanks – PWST (API 620 Tank)Design, Supply of Material, Construction, Inspection, Testing, and Painting within the scope of works for 14 Nos API 620 Decanting/Settling Tanks in the project of EPIC FOR DUKHAN PRODUCTION FACILITIES UPGRADE (DPFU) PHASE-1A-PACKAGE 1 Doha, State of QatarNovember 2020August 2022Black Cat Engineering & Construction
2PW/01-2/TC/TDR-12/2020Supply, Installation, Testing, and Commissioning of Natural Gas Pipework from QP MS4 to Qatar Steel NG Receiving Station1.5 KM,16 inches CS underground NG pipeline complete works including all civil, mechanical, hydro testing & pigging including above-ground piping and its tie-ins with Hook-up at Qatar Petroleum  stations, etcDecember 2020May 2022
3CCTC/P543/SC-004EPIC for Fabrication & Erection of Fire Water Steel TankEngineering, Supply, Fabrication & Installation of API -650, CS Fire Water Storage Tank – DukhanAugust 2021May 2022Control Contracting & Trading  Co. Pvt.  (Qatar)
4CCTC/P543/SC-007Fire Fighting Carbon Steel Piping WorksPreparation of shop drawing, site measurements, fabrication, spool hydro test, installation, erection, a site-based hydro test of firefighting CS piping works for EPIC for upgrade of fire detection and fire fighting system in existing core store, DukhanAugust 2021May 2022Control Contracting & Trading  Co. Pvt.  (Qatar)
5RL/STC/M/95/21Primary And Secondary Seals Replacement In PygasTank TK-1142 BPrimary And Secondary Seals Replacement In PygasTank TK-1142 B AT RLOCApril 2022April 2023
6WN-QNFE-AP-20220426-01QatarGasNFE EPC –2 –Cryogenic TanksPre-Fabrication of Compression Plates for Cryogenic TanksMay 2022May 2023Woongnam