S. No. | Contract No. | Project Title | Project Description / Specification | Month Awarded | Expected Completion Date | Owner | Client |
1 | 18175/SC-0043 | Design, Supply, Welding, Site Erection, Testing, Calibration, and Painting of Settling Tanks – PWST (API 620 Tank) | Design, Supply of Material, Construction, Inspection, Testing, and Painting within the scope of works for 14 Nos API 620 Decanting/Settling Tanks in the project of EPIC FOR DUKHAN PRODUCTION FACILITIES UPGRADE (DPFU) PHASE-1A-PACKAGE 1 Doha, State of Qatar | November 2020 | August 2022 |  | Black Cat Engineering & Construction |
2 | PW/01-2/TC/TDR-12/2020 | Supply, Installation, Testing, and Commissioning of Natural Gas Pipework from QP MS4 to Qatar Steel NG Receiving Station | 1.5 KM,16 inches CS underground NG pipeline complete works including all civil, mechanical, hydro testing & pigging including above-ground piping and its tie-ins with Hook-up at Qatar Petroleum stations, etc | December 2020 | May 2022 |  |
3 | CCTC/P543/SC-004 | EPIC for Fabrication & Erection of Fire Water Steel Tank | Engineering, Supply, Fabrication & Installation of API -650, CS Fire Water Storage Tank – Dukhan | August 2021 | May 2022 |  | Control Contracting & Trading Co. Pvt. (Qatar) |
4 | CCTC/P543/SC-007 | Fire Fighting Carbon Steel Piping Works | Preparation of shop drawing, site measurements, fabrication, spool hydro test, installation, erection, a site-based hydro test of firefighting CS piping works for EPIC for upgrade of fire detection and fire fighting system in existing core store, Dukhan | August 2021 | May 2022 |  | Control Contracting & Trading Co. Pvt. (Qatar) |
5 | RL/STC/M/95/21 | Primary And Secondary Seals Replacement In PygasTank TK-1142 B | Primary And Secondary Seals Replacement In PygasTank TK-1142 B AT RLOC | April 2022 | April 2023 |  |
6 | WN-QNFE-AP-20220426-01 | QatarGasNFE EPC –2 –Cryogenic Tanks | Pre-Fabrication of Compression Plates for Cryogenic Tanks | May 2022 | May 2023 |  | Woongnam |